CAS No.: | 86-86-2 |
---|---|
Formula: | C12h11no |
EINECS: | 201-704-2 |
Still deciding? Get samples of US$ 1/g
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name |
1-Naphthylacetamide NAD |
Specs. |
98%TC |
CAS NO. |
86-86-2 |
Classification |
Plant growth regulator/agrochemical |
Mode of action |
Acts by inducing formation of an abscission zone in the peduncle |
Application |
It always used with root-chemical on apple tree, pear tree or peach tree as root-taken PGR. It also can dredge the flowers and fruits of apple, pear and increase fruit-yield. |
Application Cautions |
Notes and Cautions: 1. When it is used for fruit thinning agent, the duration should be controlled. And the effect is related with temperature, so before promoting in large range, the trial experience is necessary. 2. This product is wide-used for the main ingredient root promoter in US and EU, there is no supporting data for the formula. 3. Wear protecting glasses when applying. |
Package |
1kg/aluminium foil bag, 25kg/drum |
Delivery Time |
Within a week after order placed |
Naphthylacetamide 98% Physical and Chemical Properties |
|
Chemical Name |
2-(1-Naphthyl)acetamide |
Molecular Formula |
C12H11NO |
Molecular Weight |
185.2 |
Melting Point |
182-183 Degree C |
Appearance |
White crystal powder |
Assay |
98%min |
Loss on drying |
0.5%maz |
Residues after ignition |
0.5%max |
Solubility |
In water 39mg/kg (40 Degree C). 2. Soluble in acetone, ethanol and isopropanol. 3. Insoluble in kerosene and carbon disulfide. |
Stability |
Stable under normal storage conditions |
Corrosive properties |
It hasn't irritation to skin, but can damage eyes if mis-operation is occur |
Packing | 1kg/bag, 25kg/drum or as customers'requirement |
Delivery time | 5 days by express, 10 days by air, 15 days by sea |
Shipping time by express | 5-7 days, by TNT, DHL, FEDEX, UPS, EMS |
Shipping time by sea | 7-10 days |
Shipping time by air | South America : around 40-60 days Southeast Asia: around 10-25 days Africa: around 40 days Europe: around 35 days |